Competence in Steel

Comprehensively supplied with our all-encompassing service portfolio. From complex steel construction through to universal industrial hall – everything from a single source: project handling, planning, design, production and assembly.

Hidden Markets Champion der Metalltechnischen Industrie

World market leader ZEMAN Bauelemente: Awarded as Champion in “Hidden Markets 2019”

As a machine builder, the ZEMAN group once again proves its position as a global market leader in the field of fully-automated assembling and welding of structural steel beams. For the installation of the “Steel Beam Assembler” (SBA) for Cullen Steel Fabrication in Australia, ZEMAN Machines was awarded as Champion in “Hidden Markets 2019” by the Austrian Association of Metaltechnology Industries…

Brückenhebung Wien

35 ton bridge lifted

Today we lifted and installed an almost 38.5 metre long pedestrian bridge in Vienna, watched by spectators. The challenges were the delivery of the almost

Feuerstein-Arena

Update. Feuerstein-Arena – successfully completed. After sofisticated precision work on construction of the bearing structure of the Feuerstein-Arena the project was completed in time and to the customer’s fullest satisfaction.

Hidden Markets Champion der Metalltechnischen Industrie

World market leader ZEMAN Bauelemente: Awarded as Champion in “Hidden Markets 2019”

As a machine builder, the ZEMAN group once again proves its position as a global market leader in the field of fully-automated assembling and welding of structural steel beams. For the installation of the “Steel Beam Assembler” (SBA) for Cullen Steel Fabrication in Australia, ZEMAN Machines was awarded as Champion in “Hidden Markets 2019” by the Austrian Association of Metaltechnology Industries…

Brückenhebung Wien

35 ton bridge lifted

Today we lifted and installed an almost 38.5 metre long pedestrian bridge in Vienna, watched by spectators. The challenges were the delivery of the almost

Feuerstein-Arena

Update. Feuerstein-Arena – successfully completed. After sofisticated precision work on construction of the bearing structure of the Feuerstein-Arena the project was completed in time and to the customer’s fullest satisfaction.