Today we lifted and installed an almost 38.5 metre long pedestrian bridge in Vienna, watched by spectators. The challenges were the delivery of the almost 20-metre-long and about three-metre-wide elements by special transport from our factory in Poland, the installation in limited space on site on public roads and that no trees were damaged in the process. A 200 tonne crane was used for this. Mission accomplished.